Wind energy archive / Monte Redondo
Wind turbine components during a crane-assisted installation. The photograph is identified in the historical archive as Monte Redondo, a wind farm located in Chile’s Coquimbo Region according to ENGIE.
Project Cargo / Projects
Transport logistics and engineering, including project planning, route studies, geometric and structural feasibility analysis, and coordination of loading and unloading.
PHOTOGRAPHIC ARCHIVE
Photographic material supplied for ZCN: industrial cargo, energy equipment and sailing environments. Descriptions focus on what the images document.
Select a photograph to open the full image in a new tab.
Wind turbine components during a crane-assisted installation. The photograph is identified in the historical archive as Monte Redondo, a wind farm located in Chile’s Coquimbo Region according to ENGIE.
Electrical equipment on a transport platform and during lifting operations. The photographs show the handling of industrial equipment identified in the archive as cargo for Cajón del Maipo.
Ice, open sea and deck conditions during an Antarctic voyage. This sequence brings together seascapes and scenes on board without assigning a station, expedition or specific cargo that the images do not identify.
A view of the vessel Elisabeth Böye, whose name is visible on the hull. The material is kept alongside the earlier website’s SAAS and Falkland Islands record; the image is not presented as part of an owned fleet.
A locomotive on a multi-axle platform beside a crane. The image records the arrangement of railway equipment and supporting machinery during transport.
Industrial hoppers suspended during cargo handling. The two views show the lifting points and movement of these pieces during loading, without adding an unverified client, port or tonnage.
INFORMATION SHEET
Information sheet on preparation, securing and ship loading in Valparaíso in April 2024, based on an independent report that does not mention ZCN.
Open information sheet · PDF ↗PDF · English · 1 page · opens in a new tab.
Documented experience
Historical transport and logistics cases. The archive includes experience predating the foundation of ZCN.
Logistics and transport of three generators.
2005
Establishing a shipping operation, container administration and port agency services.
2009–2010
Logistics studies, reactors and autotransformers on Ilo–Montalvo and Callao–Mantaro routes.
Receiving, storage, loading, lashing and unloading; project-specific logistics studies.
Logistics study
Logistics study for airport expansion and historical cargo supply operations.
November 2008–April 2009
Ten complete towers: shipping, unloading at Coquimbo, storage and transport to the wind farm.
2009
Nine complete towers: origin transport, shipping, unloading, storage and delivery to the wind farm.
2017
Transport from San Antonio to Puerto Montt, Osorno and Temuco.
2016–2018
Wagons, locomotives and rails; operations between Calera, Baquedano, Vallenar and Las Losas port.
SINOVAC COVID-19 vaccine transport operation, contracted by Perilogistic according to the article.
2019
Receiving, transport and unloading on site in the Cajón del Maipo.
Project gallery
January 2026 presentation
The supplied presentation adds recent operations and complements the historical archive.
View presentation↗English brochure, p. 10.
The historical reference provides Antarctic context; it does not identify the same operation.
English brochure, p. 11.
Logistics and ramp transport, Falkland Islands.
English brochure, p. 12.
English brochure, p. 13.
English brochure, p. 14.
EIFFAGE Tucúquere; IM2 Ciprés and Granada; IM2 Cocharcas and Canchas.
English brochure, p. 15.
Case cited in the presentation.
English brochure, p. 16.
Case cited in the presentation.
English brochure, p. 17.
Exports to Southeast Asia.
English brochure, p. 18.
Wind farm project.
English brochure, p. 19.
Port of San Antonio.
English brochure, p. 20.
The archive includes experience predating ZCN's founding.
Let's discuss the cargo, route and operation.